Technical Specification Template

Write a technical specification for engineering to quote: requirements, operating conditions, materials, tolerances, tests and sign-off, then print it, save it as a PDF or copy it. The form starts with a filled example, a stainless conveyor for a food plant, so you can see the format. Clear it, add a row for each thing the customer asked for, and the document builds in the preview below.

A general format, not engineering or legal advice. If the customer or your company sets a specification format, follow that one.

What a technical specification includes

  • Header

    The customer, the project or equipment, the site, a document number, the revision letter, the date and who prepared it. Engineering and the customer quote the number and revision back to you.

  • Purpose and scope

    Two or three sentences on what the customer needs and why, then what is included and what is not. A clear "not included" line saves the most arguments later.

  • Functional requirements

    What the equipment has to do, one requirement per row, each with a reference such as R1 and a priority: must, should or nice to have.

  • Operating conditions

    What it has to live with: ambient temperature, humidity, washdown or dust, pressure, duty cycle, power and air supply. These drive materials and price more than anything else.

  • Materials and finishes

    The material for each main part and its finish, in the customer's words. Mark anything the customer still has to confirm.

  • Dimensions and tolerances

    Each key size with its nominal value and the tolerance. Include the size range of the product it handles, if it handles one.

  • Performance criteria

    The numbers that decide whether it works, such as throughput, flow or noise, each with how it will be measured.

  • Applicable standards

    The standards, codes and customer documents the customer names. Write them down as given and ask the customer to confirm the list.

  • Interfaces

    Where it connects to the rest of the plant: upstream and downstream equipment, mechanical fixings, power, controls signals.

  • Testing and acceptance

    Each test, who witnesses it and the pass criterion, written so that both sides can tell whether it passed.

  • Deliverables

    Drawings, schematics, manuals, spare parts lists and anything else that ships with the equipment, with due dates when they are known.

  • Open questions, revisions, sign-off

    What is still unknown with an owner for each, a revision history so everyone works from the same version, and names for sign-off with space to sign.

How to write a technical specification after a customer visit

1. Fill in the header and the purpose the same day. Write the customer's own words for what they need and why.

2. Write the scope: what you will supply and, just as important, what you will not.

3. List the functional requirements, one per row, and mark each one must, should or nice to have.

4. Add the operating conditions, materials, dimensions and performance numbers exactly as they were given, with units.

5. Write down every standard or customer document the customer mentioned, and ask them to confirm the list.

6. Put each gap in open questions with a name against it.

7. Send revision A to the customer to check before engineering quotes from it.

Filled example: a stainless case conveyor for a food plant. The purpose is to replace the conveyor between the case packer and the palletizer. Four requirements, from "carry sealed cases to the palletizer" (must) to "tool-free belt removal" (nice to have). Operating conditions: a chilled hall at 2 to 30 °C, daily washdown up to 60 °C, two shifts, 400 V power to confirm. Materials: 304 stainless frame with welds ground, a food-contact belt in a grade the customer still has to confirm. Dimensions: 12,000 mm long, 600 mm belt, 850 mm top of belt. Performance: 40 cases a minute over 30 minutes at the factory test. Two open questions, each with an owner. It is the example the form starts with, so every value can be changed.

Empty rows and empty sections stay out of the printout and the copied text, so a small job gives a short spec.

Writing up the visit itself, with who you met and the next steps? Use the site visit report template; this page is the spec engineering quotes from.

Once the order is placed, track the drawings and data sheets you send for approval in the submittal log template.

Technical specification, functional specification, RFQ, submittal

Technical specification
How the thing has to be built and perform: conditions, materials, dimensions, tolerances, performance, standards, tests. This template, with the functional requirements included.
Functional specification
What the thing has to do, from the user's side, without saying how. In many quotes it is a section of the technical spec rather than a separate document.
RFQ (request for quote)
The buyer's request for a price, usually with a technical specification attached. The spec says what; the RFQ asks how much and by when.
Submittal
Documents the supplier or contractor sends back for approval before supplying, such as drawings and data sheets, to show the product meets the spec.

Tips for a spec engineering can quote from

  • Write units on every number

    "850 mm, ± 10 mm" can be built. "About waist height" means another call to the customer.

  • Separate must from nice to have

    Engineering can price the must items as the base and the rest as options, so the quote does not grow for things the customer would drop.

  • Do not guess the standards

    Write down what the customer names and ask them to confirm. A missing or wrong standard is expensive to find after the order.

  • Send it back to the customer

    A customer who reads revision A can correct a wrong number before it ends up in a quote. Change the revision letter each time it changes.

For sales engineers turning customer meetings into quotes: what a submittal is, the RFQ template, how sales engineers document technical meetings.

The temperatures, sizes and tolerances were said out loud.

You just wrote this spec from memory. With ParrotNotes on your phone, you record the customer visit, or a recap spoken in the car afterwards, and the app gives you the transcript, a summary and the action items, so the spec starts from what was actually said.

Get Started Free

Related tools

Technical specification questions